Enter your capacity and consumption to see the bill line by line: capacity, consumption, meter fee and VAT.
How a chiller bill is built
If your building is on district cooling, your air conditioning runs on chilled water piped in from a central plant, and the plant operator (or a billing company acting for it) sends you a bill separate from DEWA’s. In Dubai that bill has two regulated parts. Executive Council Resolution No. 6 of 2021, Article 11(a), says tariffs are based on cooling capacity and may also use cooling energy.
- Capacity charge, also called the demand charge. You pay for a fixed amount of cooling capacity reserved for your unit, measured in refrigeration tons (RT). One RT is 3.517 kW of cooling. The developer sets your RT from the unit’s size and type, and it is in your contract and on every bill. You pay it every month, whether the AC is on or not.
- Consumption charge. You pay for the chilled water you actually used, measured in RT-hours (RTh) by the meter on your unit. This is the part that climbs in summer.
On top come a meter or billing-service fee, the DEWA fuel surcharge that providers pass through, and 5% VAT on all of it.
Resolution 6/2021 also says what the bill must show: the contracted capacity, the capacity unit rate, the consumption, the consumption unit rate and any billing service charges. If your bill does not show these, ask the provider for them.
Empower’s published rates
Empower (Emirates Central Cooling Systems Corporation) is the only Dubai provider we found that publishes a rate card. These are the figures from its charges page, calculator and FAQ.
| Charge | Rate | How it is billed |
|---|---|---|
| Capacity (demand) charge | AED 750 per RT per year | Monthly in advance, pro rata to the days in the month |
| Consumption charge | AED 0.568 per RTh | Monthly in arrears, from your meter |
| Meter maintenance | AED 30 a month or AED 50 a quarter | Depends on location |
| Fuel surcharge | Passed through from DEWA | No per-RTh figure published |
| Disconnection for non-payment | AED 500 | Per disconnection |
| Voluntary disconnection | AED 150 | Per instance |
| Meter test, no fault found | AED 160 | Only if the meter is accurate |
| VAT | 5% | On every charge |
Empower also charges a one-time connection fee, but does not publish the amount. We have not verified a separate reconnection fee.
Worked examples
The slips below come from the same code as the calculator, and each is a test case.
A 6 RT unit in January
6 RT is Empower’s own example. With 600 RTh on the meter (Empower’s January planning range for 6 RT is 481 to 864 RTh) and a AED 30 monthly meter fee:
Monthly cooling bill estimate
| Capacity (demand) charge6 RT × AED 750 a year × 31 ÷ 365 days | AED 382.19 |
|---|---|
| Consumption charge600 RTh × AED 0.568 | AED 340.80 |
| Meter maintenance feeAED 30 a month | AED 30.00 |
| Before VAT | AED 752.99 |
| VAT 5%On every line above | AED 37.65 |
| Estimated bill | AED 790.64 |
Fuel surcharge not included: providers pass it on as DEWA notifies it, and no per-RTh figure is published. Capacity charge uses the annual rate ÷ 365 days, the formula on Empower's charges page. Estimate only; your official bill takes precedence.
The capacity charge is 6 × 750 = AED 4,500 a year, and January’s share is 4,500 × 31 ÷ 365 = AED 382.19.
A 3 RT unit in a hot July
Empower’s planning figures put a high July at 369 RTh for every RT, so a 3 RT unit could use 1,107 RTh. This one pays its meter fee quarterly:
Monthly cooling bill estimate
| Capacity (demand) charge3 RT × AED 750 a year × 31 ÷ 365 days | AED 191.10 |
|---|---|
| Consumption charge1,107 RTh × AED 0.568 | AED 628.78 |
| Meter maintenance feeAED 50 every 3 months, shown as a monthly third | AED 16.67 |
| Before VAT | AED 836.55 |
| VAT 5%On every line above | AED 41.83 |
| Estimated bill | AED 878.38 |
Fuel surcharge not included: providers pass it on as DEWA notifies it, and no per-RTh figure is published. Capacity charge uses the annual rate ÷ 365 days, the formula on Empower's charges page. Estimate only; your official bill takes precedence.
Consumption is now three quarters of the bill. The capacity charge is the same AED 191.10 it would be in any 31-day month.
An empty flat
The same 3 RT unit in June, empty, with zero consumption. Empower’s capacity and meter charges carry on while a unit is disconnected:
Monthly cooling bill estimate
| Capacity (demand) charge3 RT × AED 750 a year × 30 ÷ 365 days | AED 184.93 |
|---|---|
| Consumption charge0 RTh × AED 0.568 | AED 0.00 |
| Meter maintenance feeAED 30 a month | AED 30.00 |
| Before VAT | AED 214.93 |
| VAT 5%On every line above | AED 10.75 |
| Estimated bill | AED 225.68 |
Fuel surcharge not included: providers pass it on as DEWA notifies it, and no per-RTh figure is published. Capacity charge uses the annual rate ÷ 365 days, the formula on Empower's charges page. Estimate only; your official bill takes precedence.
Three ways Empower itself works out the capacity charge
This is the part that makes chiller bills hard to check to the dirham. For a 6 RT unit in January, Empower’s own material gives three different capacity charges:
| Where | Method | January, 6 RT | | --- | --- | --- | | Charges page, formula as written | 4,500 ÷ 365 × 31 | AED 382.19 | | Charges page, result as printed | the page prints 387.50, which is 4,500 ÷ 360 × 31 | AED 387.50 | | Online calculator | 750 ÷ 12 rounded to 63, × 6 RT | AED 378.00 |
The gap is under AED 10 a month for 6 RT, but it explains why a careful calculation can be a few dirhams off your bill. Our calculator uses the formula Empower prints (÷ 365) and says so on the slip. We do not know which divisor Empower’s billing system uses.
How much cooling you will use: Empower’s seasonal figures
Empower’s calculator assumes a fixed amount of consumption per RT for each month, in a low and a high version. These are Empower’s planning figures, not regulated benchmarks, but they are the only official consumption profile we found. The calculator above uses them to show a range under the consumption field.
| Month | Low (RTh per RT) | High (RTh per RT) |
|---|---|---|
| January | 80.19 | 144 |
| February | 89.1 | 144 |
| March | 121.5 | 198 |
| April | 186.3 | 297 |
| May | 226.8 | 360 |
| June | 226.8 | 360 |
| July | 234.9 | 369 |
| August | 234.9 | 369 |
| September | 226.8 | 360 |
| October | 186.3 | 297 |
| November | 121.5 | 198 |
| December | 89.1 | 144 |
| Year | 2,024.19 | 3,240 |
For 6 RT, Empower’s calculator turns these into a capacity charge of AED 4,500 a year and consumption of AED 6,898 to AED 11,042 a year, before VAT and meter fees.
Chiller-free or chiller-paid: comparing two flats
“Chiller-free” is a listing term, not a regulated one. We found it used for two different set-ups:
- Cooling included. The building is on district cooling, but the landlord pays the provider and recovers the cost through the rent or service charge. You get no chiller bill.
- No district cooling. Each unit has its own air conditioning running on electricity. There is no chiller bill, but the AC load shows up on your DEWA bill.
Ask which one it is. To compare a chiller-free flat with one where you pay the cooling yourself, estimate a year of cooling for the second flat. For a 3 RT unit on Empower’s rates with a AED 30 monthly meter fee:
- capacity: 3 × 750 = AED 2,250
- consumption: 3 × 2,024.19 × 0.568 = AED 3,449.22 (low) to 3 × 3,240 × 0.568 = AED 5,520.96 (high)
- meter fee: 12 × 30 = AED 360
- with 5% VAT: about AED 6,362 to AED 8,538 a year
That is our arithmetic on Empower’s figures, not a published number. If the chiller-free flat is the “cooling included” kind, that range is roughly what the higher rent or service charge is buying you. If it is the “own AC” kind, part of the saving goes back to DEWA.
Other providers
Emicool
Emicool publishes its fee structure but not its rates. According to its FAQ:
- the capacity rate is the “fixed annual rate outlined in your Emicool contract”, divided into 12 monthly payments and payable “regardless of connection or consumption”
- there is a refundable security deposit of 8 months of the contracted capacity charge
- activation costs AED 200, and a late payment fee is AED 100
- DEWA’s monthly fuel surcharge is passed through, based on the electricity used to make the chilled water
- a fixed metering charge applies per meter or invoice, amount not published
- if a meter fails, the bill is estimated from the same month last year (for at most two cycles), or else from the previous month
For an Emicool bill, choose “Another provider” in the calculator and enter the capacity and consumption rates printed on your bill.
Tabreed and others
We found no official page from Tabreed or any other Dubai provider with a residential rate per RT or per RTh. Rates are set building by building or contract by contract. The calculator will not guess them: enter the rates from your bill.
Billing companies
In many buildings the bill comes from a billing service provider, a sub-metering company that reads the meters and bills residents, rather than from the plant operator. Resolution 6/2021 covers billing service providers too, and their billing-service charges need the same approval as the cooling tariffs.
Abu Dhabi
Abu Dhabi’s Department of Energy regulates district cooling under Law No. 11 of 2018, with District Cooling Regulations in force since September 2019. The page we checked publishes no end-user rates, so this calculator is for Dubai.
The rules behind the bill
Executive Council Resolution No. 6 of 2021, issued on 4 March 2021, regulates district cooling and billing services in Dubai, including special development zones and free zones such as DIFC. The parts that matter for a resident:
- Every charge needs approval. The Supreme Council of Energy approves all charges and tariffs that permit holders propose (Article 12(a)), and no permit holder may collect a charge that has not been approved (Article 12(b)).
- The bill has to show its working. Contracted capacity, capacity unit rate, consumption, consumption unit rate, billing service charges and other details the Regulatory and Supervisory Bureau requires.
- Two named surcharges. A low delta-T surcharge and an excess cooling load surcharge are approved surcharge types.
- A standard contract. The Regulatory and Supervisory Bureau approves a standard customer contract, and existing contracts are to be amended to match it.
Empower also states that since 1 January 2011, following a Supreme Council of Energy recommendation, district cooling companies pass DEWA tariff increases and fuel surcharges on to customers. That is why your chiller bill can move when DEWA’s fuel surcharge does.
You will read that landlord or agent markups on chiller bills are “no longer allowed”. The resolution does not mention markups by name. What it says is that unapproved charges cannot be collected, so a markup would need approval like any other charge. That is an inference from Article 12(b), not a quoted rule.
Edge cases
- Vacant unit. The capacity charge and meter fee keep running. Empower says demand and meter charges continue while disconnected, and Emicool says its capacity charge is payable regardless of connection or consumption. An empty 3 RT flat on Empower costs about AED 226 a month.
- Moving in or out mid-month. Empower’s capacity charge is pro rata to days, so a partial month should carry a partial charge. Check the dates on your first and last bills.
- Estimated readings. If the bill says “estimated”, the consumption is not from your meter. Emicool’s rule is to use the same month last year, for at most two cycles. The next actual reading corrects it.
- Meter you think is wrong. Empower will test it. If the meter is accurate, the test costs AED 160.
- AC off all winter. Consumption can fall close to zero, but the capacity charge does not.
- RT on the bill differs from the contract. Raise it with the provider. RT is set by the developer and should not change from month to month.
If you think the bill is wrong
Start with the provider or billing company, in writing. Ask for the contracted RT, both unit rates and the meter readings, which Resolution 6/2021 requires the bill to show anyway. Compare them with the calculator. If a charge appears that you cannot match to an approved tariff line, ask what approval it is billed under.
The resolution names the Regulatory and Supervisory Bureau as the regulator for district cooling in Dubai. We have not verified a public complaints channel for residents, so we do not link one here.
Common mistakes in other guides
- “AED 0.568 fils per RT per hour.” The rate is AED 0.568 per RT-hour, which is 56.8 fils. The garbled wording appears on Empower’s own charges page and has been copied widely.
- “AED 0.62 per RTh.” We found this figure on no Empower or government page. Empower’s 0.568 plus 5% VAT is 0.596, not 0.62.
- Capacity billed quarterly. Empower’s charges page says the capacity charge is billed monthly in advance. The quarterly figure in its material is the AED 50 meter fee in some locations.
- One “typical” monthly cost per bedroom. Bills depend on the RT the developer assigned to that unit, the season and the provider’s rates. A single figure per bedroom count is a guess.
- Chiller cost “included in DEWA”. Not for district cooling. It is a separate bill from a separate company.
How this calculator works
- Inputs: provider, contracted capacity (RT), this month’s consumption (RTh), billing month, meter fee, and optionally other charges from your bill such as the fuel surcharge. For providers other than Empower, the capacity and consumption rates from your bill.
- Capacity: RT × annual rate × days in the month ÷ 365. February is 28 days, or 29 in a leap year.
- Consumption: RTh × rate.
- Meter fee: AED 30 for a monthly fee, or a third of AED 50 for a quarterly fee, so the month shows its share.
- VAT: 5% on the subtotal, rounded to the fil.
- Not included: the fuel surcharge (no per-RTh figure is published; add it from your bill), connection fees and deposits.
Nothing you type leaves your browser. The figures behind the calculator are in the sources list below with the date each was checked.
Sources
Last checked against the source
Every figure on this page comes from these documents. Open them to check our working.
- Empower: Charges Explanation empower.ae
- Empower: Charges Calculator (rates and monthly RTh-per-RT assumptions read from the page) empower.ae
- Empower calculator script (formulas) empower.ae
- Empower: FAQs (RT set by developer; tariffs subject to revision) empower.ae
- Emicool: FAQ (security deposit, activation fee, charge definitions) emicool.com
- Executive Council Resolution No. (6) of 2021 Regulating the Provision of District Cooling Services in the Emirate of Dubai dlp.dubai.gov.ae
- Department of Energy (Abu Dhabi): District Cooling economic regulation doe.gov.ae
- Empower's charges page says 'AED 0.568 fils per RT per hour'. The rate is AED 0.568 per RTh (56.8 fils); the 'fils' in that sentence is a slip, and some pages repeat it.
- Empower's published demand-charge example does not add up: it gives 4,500 ÷ 365 × 31 = 387.50, but that sum is 382.19. 387.50 is what 4,500 ÷ 360 × 31 gives. Empower does not say which divisor it bills with. The calculator on this page uses 365, the formula Empower prints.
- Empower's own online calculator uses a third method, 750 ÷ 12 rounded to AED 63 per RT per month, so a 6 RT unit shows AED 378 a month there.
- The consumption estimate uses Empower's fixed low and high RTh-per-RT figures for each month. These are Empower's planning figures, not regulated benchmarks, but they are the only official consumption profile we found.
- A rate of 'AED 0.62 per RTh' that circulates for Empower does not appear on any Empower or government page. AED 0.568 plus 5% VAT is 0.596, not 0.62.
- The developer sets a unit's RT from its area and type (Empower FAQ). Emicool and Tabreed rates depend on the building's contract; only Empower publishes a single public rate card.
- Resolution 6/2021 bars collecting charges that have not been approved, but it does not mention landlord or billing-agent markups by name. Saying markups are 'no longer allowed' is a reading of Article 12(b), not a quoted rule.
- Abu Dhabi: the Department of Energy regulates district cooling under Law 11 of 2018 (District Cooling Regulations in force since September 2019) but publishes no end-user rate on the page we checked.
- In chiller-free buildings the cooling cost sits in the rent or service charge, and the tenant's DEWA electricity bill is lower. There is no separate tariff to calculate.
Change log
| First published. Empower rates, Emicool fee structure and Executive Council Resolution 6/2021 checked against the provider pages and the Dubai Legal Portal. | |
| Executive Council Resolution 6/2021 regulates district cooling and billing services in Dubai: SCE approval of all tariffs, mandatory bill line items, RSB standard contract. | |
| Empower states that, following the Supreme Council of Energy recommendation effective 1 Jan 2011, district cooling companies pass DEWA tariff increases and fuel surcharges to customers. |
Questions people ask
How are Empower charges calculated?
Empower bills two main charges. The capacity (demand) charge is AED 750 per RT of contracted capacity per year, billed monthly in advance and pro rata to the days in the month. The consumption charge is AED 0.568 per RT-hour, read from your meter and billed monthly in arrears. A meter maintenance fee of AED 30 a month or AED 50 a quarter applies depending on location, DEWA's fuel surcharge is passed through, and 5% VAT is added to everything.
What is the difference between capacity and consumption charges?
The capacity charge pays for the cooling capacity reserved for your unit, measured in refrigeration tons (RT). It is fixed by your contract and is due whether or not you run the air conditioning. The consumption charge pays for the chilled water you actually used, measured in RT-hours (RTh) on your meter, so it rises in summer and falls in winter.
What does chiller-free mean in Dubai?
It means the tenant gets no separate district cooling bill. We found no regulation that defines the term. In practice it describes either a building where the landlord pays the cooling provider and recovers the cost through the rent or service charge, or a building with no district cooling at all, where each unit's own air conditioning runs on DEWA electricity and shows up on the DEWA bill instead.
Why is my Empower bill higher than expected?
Usually one of four things: summer consumption (Empower's own planning figures assume two and a half to three times as many RT-hours per RT in July and August as in January), the capacity charge that is due even when the unit is empty or the AC is off, the fuel surcharge passed through from DEWA, and 5% VAT on every line. Check that the RT on the bill matches your contract and that the meter readings are actual, not estimated.
Is chiller cost included in DEWA?
No. In a building on district cooling, the cooling provider (Empower, Emicool, Tabreed or another company) or a billing service provider sends its own bill. DEWA bills electricity and water. The two are linked only through the fuel surcharge, which cooling providers pass on as DEWA notifies it.
How much is district cooling per month for a 1-bedroom?
There is no reliable typical figure, because the developer sets the contracted RT unit by unit. As an illustration with Empower's rates: a unit contracted at 3 RT would pay about AED 376 in January and AED 652 to AED 892 in July, including a AED 30 meter fee and VAT, using Empower's own low and high planning figures for consumption. Put your own RT and meter reading into the calculator for a real figure.
Who pays the chiller capacity charge, tenant or landlord?
Whoever holds the cooling account, which the tenancy contract normally settles. The charge follows the unit, not the person: Empower's capacity and meter charges continue while a unit is disconnected, and Emicool says its capacity charge is payable regardless of connection or consumption. Between tenancies, that usually means the owner pays.